Access the Full Project by Clicking here!
Bidjugde
JOB
Construction Haven Drive Comanche Dr Meyer St
BID DATE
05/7/25 - 1:00
AGENCY
Arvin
ESTIMATE
n/a
SCOPE
The work shall consist of two distinct but related bid packages. The first is for the resurfacing and rehabilitation of the existing roadway with a “Full Depth Reclamation” (FDR) methodology. Additional work will include selective demolition within the roadway and along adjacent sidewalks, protection and modifications to existing manhole and utility structures, installation of new curbs, gutters, sidewalks, ADA curb ramps, and installation of new traffic striping and signage. https://www.arvin.org/bids.aspx?bidID=17

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT