W Arizona Ave Alabama Ave 113th Ave Storm Drain Manhole
BID DATE
05/6/25 - 7:00
AGENCY
Youngtown
ESTIMATE
n/a
SCOPE
The Work to be included under this contract includes the furnishing of all labor, equipment, materials and incidentals required for the installations of the construction items outlined in the contract documents. Construct Phase 1 of flood mitigation infrastructure consisting of 10 Manholes, 6 Catch Basins, 931LF of 24", 719LF of 18", and 206LF of 12" inch Reinforced Concrete Pipe that will collect flood waters along its path and deliver them to the discharge point at the Agua Fria River, thus reducing flooding in the commercial area for a minimum 25-year storm event.