Access the Full Project by Clicking here!
Bidjugde
JOB
17th St N Over Booker Creek Bridge No 157126 Replacement
BID DATE
06/10/25 - 12:00
AGENCY
St. Petersburg
ESTIMATE
n/a
SCOPE
The project involves the removal of an existing bridge culvert (bridge no. 157126) and the subsequent construction of a new bridge culvert (bridge no. 157409) along with adjacent canal walls within the limits of the right-of-way. The new bridge culvert will be constructed in the same location as the existing, accommodating two lanes of traffic and two raised sidewalks. During construction, the roadway will be closed whereby vehicular and pedestrian traffic shall be maintained with a detour on temporary lanes as outlined in the plans. https://procurement.opengov.com/portal/stpete/projects/111565 gabriella.dipiazza@stpete.org
UPDATES