Access the Full Project by Clicking here!
Bidjugde
JOB
2025 Annual Street Resurfacing
BID DATE
05/13/25 - 11:00
AGENCY
Marco Island
ESTIMATE
n/a
SCOPE
The work will consist of milling two inches (2”) of existing pavement edge (3’ width) at the following locations: Winterberry Dr. from Collier Blvd to the west base of W. Winterberry Bridge, Heathwood Dr. from San Marco Rd. to the south to the Cul-de-sac, and Century Dr. from Collier Blvd. to Tigertail Ct. Manhole and valve adjustments, temporary pavement striping, raised pavement markers and thermoplastic striping, and side street transitions are also included. The work shall be in accordance with the current edition of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction. https://www.demandstar.com/app/limited/bids/495770/details

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT