Access the Full Project by Clicking here!
Bidjugde
JOB
Swan Creek Channel Restoration Phase 1
BID DATE
04/30/25 - 10:00
AGENCY
Pierce County
ESTIMATE
n/a
SCOPE
Work includes the installation of in-stream engineered log structures using various material delivery and installation methods including via helicopter, logging equipment, and traditional heavy equipment. The work will include procurement, delivery, and assembling of large to small diameter wood, furnishing and driving un-treated timber piles, installing ground anchors, chain lashing, racking, slash, and boulders. The work will include stream isolation and flow diversion and localized dewatering. The work also includes selective clearing and re-incorporation of woody debris into project elements. The project also includes establishing and restoring staging areas and temporary equipment access paths, traffic control, erosion and sediment control, invasive weed removal, seeding, revegetation and other work specified, all in accordance with these Contract Provisions and the Standard Specifications. https://procurement.opengov.com/portal/piercecountywa/projects/158099 ashley.carabelos@piercecountywa.gov
PREBID
4/16/2025 6:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT