Access the Full Project by Clicking here!
Bidjugde
JOB
Beaumont Street Rehab Phase Vi Sewer Line Replacement
BID DATE
04/24/25 - 11:00
AGENCY
City of Beaumont Water Utilities
ESTIMATE
$1,933,050
SCOPE
1-Provide a construction schedule to facilitate scheduling of work to be performed by the OWNER and others. The CONTRACTOR will be required to submit for the ENGINEER’s approval, a construction sequence of the phased installation for the proposed work. The OWNER shall reserve the right to make adjustments to the construction sequence to limit the number of service interruptions. 2-Provide bypass pumping and sewer flow control during the pipe bursting and manhole replacement operations, as necessary. 3-The project includes the rehabilitation of existing sanitary sewer lines by pipe bursting approximately 15,500 L.F. of existing six inch or eight inch sanitary sewer mains to eight inch (8.625” OD), 1100 L.F. of existing eight inch sanitary sewer main to ten inch (10.75” OD), 375 L.F. of existing ten inch sanitary sewer main to ten inch (10.75” OD), 525 L.F. of existing twelve inch sanitary sewer main to twelve inch (12.75” OD), and 375 L.F. of existing twenty-four inch sanitary sewer mains to twenty-eight inch (28” OD) High Density Polyethylene (HDPE) pipe, as well as related manholes and service connections. 4-Tie-in the replacement sewer mains at existing laterals and manholes, including replacement or installation of 71 manholes. All manholes to be replaced/installed shall be confirmed after review of the cleaned and televised existing sewer lines and manholes. All tie-in methods shall be in accordance with the Contract documents. 5-Replace service connections on rehabilitated sanitary sewer mains. Existing service lines will be replaced completely to the property lines, with cleanouts and cleanout boxes installed at property lines. All tie-in methods shall be in accordance with the Contract documents. 6-Perform required testing of the rehabilitated main and appurtenances, as required. Deflection testing will not be required on all sections. However, the OWNER shall reserve the right to require deflection testing of any sections of line deemed necessary, at no additional cost to the OWNER. 7-Drainage – Maintain drainage within the project area at least equal to existing conditions. Restore the site to its pre-construction condition or better. https://www.civcastusa.com/project/67ee927d972d8d0f86098c14/summary dara.woodruff@beaumonttexas.gov
PREBID
4/16/2025 8:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT