Access the Full Project by Clicking here!
Bidjugde
JOB
Camino Vera Cruz Recycled Water Extension
BID DATE
05/5/25 - 11:00
AGENCY
San Clemente
ESTIMATE
n/a
SCOPE
The work to be performed, in general, consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and contract documents for the installation of approximately 142 linear feet of 4” D.I.P. and 260 linear feet of 6” D.I.P. Recycled Water pipes and its connection to existing recycled water pipe line in the City of San Clemente, CA. The general method of the recycled water construction work includes installation of Cathodic Protection, service laterals and meters, D.I. valves and fittings, and Blow-Off and Air Vac assemblies. The work also includes trench excavation & restoration, removal & restoration of concrete paved surface, and traffic control. There is a potential for night work. https://vendors.planetbids.com/portal/28939/bo/bo-detail/128440 perezr@san-clemente.org
PREBID
4/14/2025 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT