Access the Full Project by Clicking here!
Bidjugde
JOB
2025 Pavement Maintenance Overlay
BID DATE
04/15/25 - 11:00
AGENCY
Everett
ESTIMATE
$1,233,977
SCOPE
The project includes, is not limited to, the construction of up to 5,857 tons of Hot Mix Asphalt, Class ½-inch, PG 64-22, two inches (2") thick, on selected City Streets, three inches (3") thick on Ross Ave, including grinding, utility adjustments, such as manhole, catch basin, inlet, valve box, monument case and cover, striping, channelization, traffic induction loops, and performing all other work as required by the contract. http://bxwa.com/bxwa_toc/pub/263/ev52_2025_pavement_maintenance_43318/info.php

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT