Access the Full Project by Clicking here!
Bidjugde
JOB
Hcmud No 171 Elyson Basin A1a A1b
BID DATE
05/6/25 - 11:00
AGENCY
Harris County Municipal Utility District
ESTIMATE
n/a
SCOPE
1-Site Preparation, Detention Basin Excavation, off-site spoil disposal, on-site spoil disposal, drainage swales, (13) junction boxes and outfalls 2-440,000 CY of Detention Basin Excavation, and Spoil Disposal 3-4,260 LF of Backslope Interceptor Swale, and 14 Backslope Interceptor Structures 4-570 SY Concrete Slope Paving 5-390 LF of 24-inch through 66-inch RCP open cut and all appurtenances 6-240 LF of 36-inch and 60-inch RCP trenchless and all appurtenances 7-3320 LF of 5'x5', 6'x4', 6'x5', 7'x4', 7'x5', 8'x4', 8'x5', 9'x5', and 10'x6' RCB open cut construction and all appurtenances 8-Stormwater Pollution Control https://www.civcastusa.com/project/67dad5e4506206671fbbd38b/summary Msalazar@bgeinc.com
UPDATES