Access the Full Project by Clicking here!
Bidjugde
JOB
Saratoga Springs 800 West Foothill Blvd Roadway Improvements
BID DATE
04/22/25 - 8:00
AGENCY
Saratoga Springs
ESTIMATE
n/a
SCOPE
The Work consists of widening, mill-and-overlay, and restriping of the existing 800 West road from Pioneer Crossing to Pony Express Parkway (approximately 1.6 miles) and a realignment of the 800 West / 400 North / Evans Lane intersection to eliminate existing offset. Demolition work includes removal of existing asphalt pavement, removal of existing concrete, curb, utilities, street signs, etc. New construction work includes mill and overlay of existing asphalt pavement, road widening, signage, earthwork, installation of concrete curb and gutter, concrete sidewalk, street signs, roadway striping, storm drain pipe and structures, trenching vault and conduit installation for power, adjust utility manholes, and a fully signalized intersection at 400 North. https://utah.bonfirehub.com/opportunities/180690

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT