Access the Full Project by Clicking here!
Bidjugde
JOB
Chuckanut Drainage Paving Improvements
BID DATE
04/16/25 - 7:00
AGENCY
Piney Point Village
ESTIMATE
$1,200,000
SCOPE
The project includes the installation of a storm sewer collection system to replace the existing roadside ditches along both sides of the right-of-way along Chuckanut Lane and through an existing drainage easement along the southern property lines of #2 Chuckanut Lane and 239 North Piney Point Road. The project also includes the asphalt reclamation of the existing asphalt pavement for the full length of Chuckanut Lane. https://www.civcastusa.com/project/67e44bfc72bc8a8a60992e91/summary aaron.croley@hdrinc.com
PREBID
4/9/2025 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT