Access the Full Project by Clicking here!
Bidjugde
JOB
Improvements Proctor Rd Redwood Rd Camino Alta Mira
BID DATE
04/29/25 - 11:00
AGENCY
Alameda County
ESTIMATE
$4,189,900
SCOPE
The project consists, in general, of providing traffic control system and construction area signs; water pollution control work; construction site coordination; clearing and grubbing; construction survey staking; replacing failed sections of asphalt pavement surface and base; slurry seal pavement; saw cutting and removing existing concrete/asphalt concrete curb, gutter, sidewalk, pedestrian ramps; constructing new concrete curb, gutter, driveways, driveway and walkway conforms, and pedestrian ramps; removing trees; installing and maintaining new trees and shrubs; installing HMA conforms at new lip of gutters; coordination with respective utility companies, businesses and property owners; reconstructing drainage inlet; adjusting to finish grade manholes, EBMUD water meter and valve boxes, PGE boxes, sewer cleanouts and other various utilities; installing thermoplastic traffic stripe and pavement markings; furnishing and applying water; and cleaning of the site at the end of the job. https://www.ipdservices.com/clients/eastbay/?ALCO&Show=Planroom&Project=ALCO+Pub+Wks+2491+-+Improvements+of+Proctor+Rd+from+Redwood+Rd+to+Camino+Alta+Mira+in+Castro+Valley%2C+Alameda+Co.%2C+CA
PREBID
4/15/2025 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT