Lost Canyon Road Bridge Widening Over Sand Canyon Wash
BID DATE
07/29/15 - 11:00
AGENCY
Santa Clarita
ESTIMATE
$800,000
SCOPE
Generally, the Scope of Work to be performed includes, but is not limited to, bridge widening to accommodate two travel lanes, shoulders, and a bike path on the north side of the bridge. Replace existing metal beam guard railing with concrete barriers. Minor channel and slope protection slab work at the bridge abutment. Remove and replace PCC overlay and asphalt concrete. Existing steel truss pedestrian bridge serving the south sidewalk shall remain open at all time during the construction phase. The Contractor shall provide and maintain one traffic lane per each direction at all time during the construction phase. James Tong - 661-255-4366 jtong@santa-clarita.com