JOB
Hot Wells Mission Reach Water Main Replacement
BID DATE
04/25/25 - 11:00
AGENCY
San Antonio Water System
ESTIMATE
$6,000,000
SCOPE
Sealed bids are requested by the San Antonio Water System for water main replacement of existing 6-inch and 8-inch potable water mains with new 8-inch water mains. Approximately 10,763LF will be replaced via open cut and 255LF will be replaced via trenchless method. The main water replacement will be as part of the Hot Wells Mission Reach Water Main Replacement Project, https://www.civcastusa.com/project/67e474dc5a8c48b20bc01f5f/summary contracting@saws.org
PREBID
4/9/2025 11:00