Access the Full Project by Clicking here!
Bidjugde
JOB
Douglas St Miller St Camino Escondido Water Main Replacement (REBID)
BID DATE
07/21/15 - 2:00
AGENCY
Santa Fe
ESTIMATE
$200,000
SCOPE
ORG BID RESULTS: AAC Construction - $150,775 Adame Construction - $226,376 Sasquatch Inc - $245,858 Sundance Mechanical & Utility Corp - $267,807 Sparling Construction Co. - $308,626 TLC Plumbing & Utility Company - $329,724 Contracting services are required for the Douglas St., Miller St., Camino Escondido Water Main Replacement project. The work is designated as City of Santa Fe Project, Douglas St., Miller St., Camino Escondido Water Main Replacement. The work consists of, but is not limited to complete in place installation of approximately 500 feet of 4-inch water main, and 1200 feet of 6-inch water main including water valves, valve boxes, 3-way fire hydrants with all appurtenances and road restoration, in accordance with the drawings, specifications, and other contract documents. The locations of the project are Douglas St. south of Arroyo Tenorio, Miller St. between Arroyo Tenorio and Camino De Las Animas, and Camino Escondido between Canyon Rd. and E. Alameda St.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT