JOB
South Circle Drive Pavement Restoration
BID DATE
04/29/25 - 5:00
AGENCY
Orange Water & Sewer Authority
ESTIMATE
n/a
SCOPE
"The state of the project site will be a saw-cut 4-foot wide trench filled with compacted ABC, which OWASA shall complete for the installation of the water main prior to pavement work. Per Detail on the Engineering Drawings, six inches of the compacted ABC will need to be removed along the trench and the remaining ABC re-compacted prior to asphalt placement. The full roadway width will be overlain with 1.5-inch asphalt. Milling of pavement is required at each end of the project corridor to establish a clean seam at the end points for transition to existing roadways. https://evp.nc.gov/solicitations/details/?id=bec0708a-f20e-f011-bae2-001dd8084fd9 DBerger@owasa.org "