Access the Full Project by Clicking here!
Bidjugde
JOB
2024 Drainage Improvements
BID DATE
04/16/25 - 2:00
AGENCY
Seattle
ESTIMATE
$3,737,500
SCOPE
This portion of the Project consists of the following elements of Work including but not limited to: construction stormwater erosion control (submittal, implementation, and maintenance of the Construction Stormwater Pollution Prevention plans (CSECP/SWPPP, TVSPP, SP, & TDP)); health and safety plan; clearing and grubbing; demolition and removal of existing surface pavement, sidewalks, and curbs; potholing; excavation; temporary traffic control plan and implementation, including flagging; site preparation and staging; survey; removal and abandoning of existing drainage structures and piping; temporary stormwater bypass; protection, relocation, and/or adjustments of existing utilities, including water services; reconnection to the existing drainage system; installation of new drainage systems, including storm drainage piping, drainage structures, bioretention cells, and flow splitters; flow testing; install gate valves and assist SPU crews with water service and meter box relocations/adjustment; television inspections; side sewer reconnections; and final site restoration, including surface paving, pavement markings, permanent signing and posts, sidewalks, curbs, driveways, curb ramps, planting, and landscape establishment. https://procurement.opengov.com/portal/seattle/projects/151376 fredrickson@seattle.gov pamela.honma@seattle.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT