Access the Full Project by Clicking here!
Bidjugde
JOB
Blake Avenue Phase 2 21st 23rd Street
BID DATE
05/6/25 - 4:00
AGENCY
Glenwood Springs
ESTIMATE
n/a
SCOPE
The goal of this project is to replace waterline, sewer lines, new storm system, roadway asphalt, roadway base material, add a multiuse path and curb and gutter to the street per the design documents in the RFP. All work is to be performed in accordance with the “State Department of Highways – Division of Highways – State of Colorado – Standard Specifications for Road and Bridge Construction”, latest edition and City of Glenwood Springs Design Standards. https://www.bidnetdirect.com/colorado/solicitations/open-bids/Blake-Avenue-Phase-2-21st-to-23rd-Street/0000381674?purchasingGroupId=8409951&origin=2 ryan.muse@cogs.us
PREBID
4/7/2025 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT