JOB
WWTP Lagoon Storage Slurry Wall
BID DATE
04/28/25 - 1:00
AGENCY
Fort Lupton
ESTIMATE
n/a
SCOPE
"Furnish and install all labor and materials for site preparation and soil-bentonite slurry wall construction activities including: 1) Mixing of bentonite to produce and place the slurry per the specifications; 2) Excavate the slurry trench per the lines and grades on the plans, including keying bedrock to minimum depths, and spoiling the excess sand material; 3) Process supplemental fines material including stripping vegetation to process the fines, hauling, mixing with bentonite and placing soil-bentonite backfill per the plans and specifications; 4) Earthwork including excavation, haul, placing, and compaction of materials as necessary to construct the work platform and consolidation cap to the lines and grades shown on the plans; 5) Required cleanup. Specifically, including all labor and materials for construction of the Slurry Walls for the Waste Water Treatment Plant as shown on the design drawings and miscellaneous items necessary for a complete and functional project. https://www.bidnetdirect.com/colorado/solicitations/open-bids/WWTP-Lagoon-Storage-Slurry-Wall-Project/0000381294?purchasingGroupId=8409951&origin=2 RVestal@FortLuptonCO.gov
UPDATES