Access the Full Project by Clicking here!
Bidjugde
JOB
Airfield Drainage Improvements Phase 2
BID DATE
04/30/25 - 2:00
AGENCY
Eloy
ESTIMATE
n/a
SCOPE
This project includes two bid schedules. Schedule I (Base Bid) involves the construction of a new drainage channel on the south side of the airfield. Schedule II (Additive Alternate Bid) involves constructing isolated repairs to an existing earthen drainage channel along the eastern side of the airfield. The intent of the work associated with Schedule I (Base Bid) is to protect existing and future infrastructure by addressing drainage issues associated with offsite run-off. The intent of the work associated with Schedule II (Additive Alternate Bid) is to repair eroded soils and construct new erosion protection along existing channel slopes. jim.cunningham@dibblecorp.com https://eloyaz.gov/Bids.aspx?BidID=72
PREBID
4/9/2025 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT