Access the Full Project by Clicking here!
Bidjugde
JOB
Salt Lake Aqueduct Replacement Reaches 2 3 Scoping
BID DATE
04/15/25 - 2:00
AGENCY
Metropolitan WD Salt Lake
ESTIMATE
n/a
SCOPE
As the first step to addressing the finished water reach of the SLA, Metro Water is currently engaged in the construction of the Salt Lake Aqueduct Replacement (SLAR) Reach 1 – a 72”, 66”, and 60” diameter welded steel pipeline from the Little Cottonwood Water Treatment Plant (LCWTP) to Fort Union Boulevard (approximately 7000 South). Despite its name, the SLAR is not intended to outright replace the SLA, but to provide resiliency, reliability, and redundancy for Metro Water and its member cities. The SLAR Reach 1 is also connected to Salt Lake City’s Big Cottonwood Water Treatment Plant through the 36” diameter Cottonwoods Connector Reach 1. Metro Water is also engaged in an effort to address the seismic resiliency of the SLA. This project – called the Salt Lake Aqueduct Hardening – considers a combination of replacement and sliplining the SLA. The SLA Hardening project will affect the hydraulic capacity of the SLA. https://utah.bonfirehub.com/opportunities/179845

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT