Access the Full Project by Clicking here!
Bidjugde
JOB
Lake Street Overlay Recycled Waterline Between Grant Street Silverado Trail
BID DATE
04/30/25 - 11:00
AGENCY
Calistoga
ESTIMATE
$1,900,000
SCOPE
The work, in general, consists of improving Lake Street between Grant Street and Silverado Trail by reconstructing the pavement; installing an extension of the City’s recycled water line; replacing specific drainage, laterals, and sections of curb, gutter, & sidewalk; traffic striping; traffic control; water pollution control; and related items of work as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer. https://www.calistogaplanroom.com/projects/1858/details/lake-street-overlay-recycled-waterline-between-grant-street-silverado-trail-pj-no-19-5536 dfradelizio@calistogaca.gov
UPDATES