Access the Full Project by Clicking here!
Bidjugde
JOB
Phase 5N Phase 6N Milling Paving Improvements
BID DATE
04/21/25 - 11:00
AGENCY
Palm Beach
ESTIMATE
n/a
SCOPE
"The general location of the proposed work within Phase 5N is bordered on the north by Country Club Road from the Intracoastal Waterway to N. County Road. Bordered on the south by Plantation Road. And proximately 200 feet south of Southland Road and to the north edge of Palm Beach Country Club and includes Ocean Lane. The general location of the proposed work within Phase 6N is bordered on the north by N Woods Road from the Intracoastal Waterway to N. County Road. Bordered on the south by Kawama Lane/ Chateaux Drive and includes Bermuda Lane and Casa Bendita. Work includes the adjustment or replacement of existing manhole rims, storm inlet grates, valve boxes prior to resurfacing and includes the milling and resurfacing of the listed streets. Work also includes the removal and replacement of selected curbing and driveways throughout the limits. https://townofpalmbeach.bonfirehub.com/opportunities/176005 dmealy@townofpalmbeach.com "
UPDATES