Access the Full Project by Clicking here!
Bidjugde
JOB
Eisenhauer Rd Northwood Devonshire Dr Area Drainage Ph 1a Pike Rd From Albin Brookside
BID DATE
04/18/25 - 2:00
AGENCY
San Antonio
ESTIMATE
$7,879,000
SCOPE
The scope of this project will include the following: install 10'x7' underground box culvert storm drain from low water crossing to trunkline from previous phase. Additionally, the low water crossing will be raised with a new 7'x4' box culvert installed. The existing channel will be demolished and the 7'x4' box culvert storm drain will be installed in its place. Pike Rd from approximately Albin to the just past the low water crossing will be reconstructed with new storm sewer inlets, sidewalks, and driveway approaches, with other related items. SAWS water line and sewer line relocations will be included with the work. CPS gas relocation is also included. https://www.civcastusa.com/project/67d44de68ea92d7be67b591c/summary melissa.ortega1@sanantonio.gov
PREBID
4/2/2025 10:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT