Access the Full Project by Clicking here!
Bidjugde
JOB
Bridge Rehabilitation NW 22 Ave NW 67 Ave Canal C 8 Bridges No 874030 No 874360
BID DATE
04/30/25 - 2:00
AGENCY
Miami-Dade County
ESTIMATE
$34,212
SCOPE
Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment and performing all operations required to construct the Work in accordance with the Contract Documents. • Bridge at NW 22nd Avenue over Biscayne Canal Bridge (C-8) – Bridge No. 874030 • Bridge at NW 67th Avenue over Biscayne Canal Bridge (C-8) – Bridge No. 874360 Bridge rehabilitation consists of the installation of Rotation Restrainers Reinforced Concrete Block. Rotation restrainers consist of building up the top ends of the intermediate bridge supports using a reinforced concrete block underneath the sidewalk. The reinforced concrete block is connected to the existing bridge supports by means of mechanical dowels and sized to completely fill the gap between the bottom of sidewalk and the intermediate support. Work will be performed from the water by means of a floating work platform/floating dock/floating barge-type vessel and/or small work skiff. The floating platform/dock/barge will be used for material containment as well as support equipment such as compressor/generator for air/power for minor concrete removal and concrete surface preparation, and material for forming the concrete. Handheld chipping tools will be used to remove concrete and drill dowel holes. All the work for the removal of the concrete, the forming for the new pour and the casting of the concrete will be done from the work platform/dock/barge in the canal. The roadway may be used for delivery of material, such as concrete, and equipment using off-peak, daytime lane closures. https://www.miamidade.gov/apps/isd/StratProc/Home/SolicitationDetails?solNumber=20240275%20(MCC%207360)
PREBID
4/11/2025 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT