Jerome Deception Lane Water Line Improvements (REBID)
BID DATE
01/29/26 - 12:00
AGENCY
Jerome
ESTIMATE
$400,000
SCOPE
Ligon Excavation - $423,942 R Blume Underground, Inc. - $425,511 Hylan West - $498,448 Mulcaire & Son Contracting - $550,527 Central Arizona Contracting - $611,280 Standard Construction Co - $799,829 RP Companies, Inc. - $851,214 Earth Resources Corporation - $888,623 Installation of approximately 1500 linear feet of 6-inch DR 14 C900 PVC water line that will connect to the water line on Gulch Road and to change the path of water lines that serve the length of Deception Lane. Improvements include installation of a regulator station on Deception Lane and hydrants at the end of Deception Lane. The dirt roadway will be regraded and drainage corrected as needed after water lines are replaced and fire hydrants are installed. rormond@nacog.org b.klein@jerome.az.gov