Access the Full Project by Clicking here!
Bidjugde
JOB
Upper Pigeon House Interceptor Replacement Phase 2
BID DATE
04/17/25 - 2:00
AGENCY
Raleigh
ESTIMATE
n/a
SCOPE
The Project consists generally of the following major items: • Installation of approximately ten sanitary sewer crossings via trenchless methods in between Wake Forest Road and the Wade Ave Exit Ramp along Capital Blvd service roads. The casings to be installed range from 24-inches to 60-inches in diameter. • Installation of approximately 8,000 LF of gravity sanitary sewer ranging from 8-inch to 42-inch via open-cut in and sanitary sewer manholes between Wake Forest Road and the Wade Ave Exit Ramp along Capital Blvd service roads. • Approximately 10,000 LF of gravity sanitary sewer to be abandoned by flowable fill ranging from 8-inch to 42-inch in between Wake Forest Road and the Wade Ave Exit Ramp along Capital Blvd service roads and along Capital Blvd. https://evp.nc.gov/solicitations/details/?id=2fdc105a-db00-f011-bae2-001dd8084fd9 todd.toler@raleighnc.gov
PREBID
3/26/2025 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT