Access the Full Project by Clicking here!
Bidjugde
JOB
Commonwealth Ave Sewer Water and Street Reconstruction
BID DATE
06/4/15 - 11:00
AGENCY
Fullerton
ESTIMATE
$2,875,000
SCOPE
Work general consists of traffic control; removing existing sewer pipes and manholes; abandonment of existing sewer pipes and manholes; installing vitrified clay sewer pipe; manholes; sewer lateral extensions and reconnections; 12-inch polyvinyl chloride (PVC) water mains; ductile iron fittings, valves and fire hydrants; copper water services sheeting, shoring and bracing; excavation; aggregate base; asphalt concrete; access ramps; sidewalk; curb and gutter; adjusting manholes and water valves to grade; traffic striping and signing; water pollution control; and all related work.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT