(CMAR) Civil Work Miller Loop 101 Water Main
BID DATE
07/24/25 - 12:00
AGENCY
Scottsdale
ESTIMATE
n/a
SCOPE
Generally, this Water TransmissionMain project will require cost estimating, value engineering, constructability review, and construction of the new water transmission main including but not limited to approximately 1,529 linear feet of 24” Class 350 DIP water main, 440 linear feet of 42” steel casing, various other pipe sizes and lengths to provide water service to adjacent parcels and connect to existing water infrastructure, valves, hydrants, and other associated appurtenances, survey, and testing. Substantial completion of the project is anticipated on or before December 15, 2025. Kimley-Horn is the engineer preparing the construction plans for the project. MillerWaterPlans@kimley-horn.com https://scottsdaleaz.bonfirehub.com/opportunities/177800