Access the Full Project by Clicking here!
Bidjugde
JOB
80th Sidewalk Overlay
BID DATE
03/27/25 - 3:00
AGENCY
Stanwood
ESTIMATE
$360,000
SCOPE
"The work to be performed under these specifications consists of furnishing all labor, tools, materials, and equipment necessary for the construction of the 80th Sidewalk and Overlay. Generally, this project includes the construction of approximately 300 feet of 5-foot wide sidewalk, planter strip, curb and gutter, and associated surface restoration as shown on the Contract Plans, these Contract Provisions, and the Standard Specifications. • Schedule A: Sidewalk, planter strip, grub and gutter, gravity block wall from 283rd to 284th. • Schedule B: 2” Grind and Overlay from 279th to approximately 284th NW. http://www.bxwa.com/bxwa_toc/pub/313/stn39_80th_sidewalk_and_overla_67225/info.php

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT