Access the Full Project by Clicking here!
Bidjugde
JOB
Knights Creek Trunkline Rehabilitation Phase 2
BID DATE
04/10/25 - 10:00
AGENCY
Valdosta
ESTIMATE
n/a
SCOPE
The work consists of clearing and grubbing of the easement area as well as supplemental work areas required by the contractor, commissioning of a preconstruction as-built survey of the existing infrastructure to serve as a performance benchmark for new construction, establishment and maintenance of an appropriately sized bypassing arrangement to maintain sustained operation of the sewer system (without overflows) during the work period, demolition of the existing gravity sewer system as necessary, installation of +/- 2,450 LF of 24¿ gravity sewer piping, installation of six (6) new 60¿ DIA precast concrete sewer manholes, maintenance of erosion control measures during construction, final stabilization of all disturbed areas with permanent grassing, and commissioning of a final as-built survey of the newly constructed infrastructure. The new sewer system may be 24¿ SDR26 PVC gravity sewer installed by way of open cut, 24¿ DR17 HDPE gravity sewer installed by way of pipe bursting, or some combination of the two methodologies. If a blended construction methodology is intended to be utilized, the existing manhole spacing must be maintained and pipe materials must be consistent from manhole to manhole. https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=PE-66249-NONST-2025-000000042&sourceSystemType=gpr20 cnevels@valdostacity.com
PREBID
3/25/2025 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT