Access the Full Project by Clicking here!
Bidjugde
JOB
N Brown E Washington Stormwater Retrofit
BID DATE
04/2/25 - 4:00
AGENCY
Sequim
ESTIMATE
$390,940
SCOPE
This contract calls for installation of subsurface stormwater infiltration trenches, 6-inch storm sewer pipe, 8-storm sewer pipe, five type 1 catch-basins, 2 concrete stormfilter catch-basins (each with three filter cartridges), one coalescing plate oil/water separator, sawcutting, concrete demolition, asphalt demolition, landscape restoration, and restoration of pavement, sidewalk and curb and gutter, and temporary traffic control, and other associated work. https://www.sequimwa.gov/bids.aspx?bidID=159

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT