Access the Full Project by Clicking here!
Bidjugde
JOB
Sweetwater Newman Park Pedestrian Bridges Rfp
BID DATE
04/2/25 - 2:00
AGENCY
Sweetwater
ESTIMATE
n/a
SCOPE
Demolition and removal of three existing pedestrian bridges as well as supporting abutments and structures in Newman Park, Sweetwater, Texas. Approximate spans of the three existing pedestrian bridges are as follows: Item A - stone bridge span of 23’-6”; Item B - a metal bridge span of 27’-6”; Item C - a metal bridge span of 37’-6”. Fabrication and delivery to the site of three 5’-0” wide pedestrian bridges to be installed in Newman Park, Sweetwater, Texas. Spans of the three new pedestrian bridges are as follows: Item A - The bridge span shall be 23’-6”. Item B - The bridge span shall be 27’-6”. Item C - The bridge span shall be 37’-6”. Installation of three 5’-0” wide pedestrian bridges to be installed in Newman Park, Sweetwater, Texas. Spans of the three new pedestrian bridges are as follows: Item A - The bridge span shall be 23’-6”. Item B - The bridge span shall be 27’-6”. Item C - The bridge span shall be 37’-6”. https://www.civcastusa.com/project/67d032b4139814dc0af8dae2/summary sage.diller@e-ht.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT