Access the Full Project by Clicking here!
Bidjugde
JOB
Verdugo Avenue Street Improvement
BID DATE
07/14/15 - 2:00
AGENCY
Burbank
ESTIMATE
$330,000
SCOPE
The work under this contract shall be performed entirely within the City of Burbank and consists of furnishing all labor, tools, materials, equipment, services and performing all work necessary for the Verdguo Avenue Street Improvement Project (HSIP 3) including but not limited to:Street widening work:*Sawcut, removal and disposal of existing asphalt concrete (AC) pavement*Sawcut, removal and disposal of existing Portland cement concrete (PCC) curb, gutter, sidewalks, driveways, cross gutters and spandrels*Installation of PCC curb extension "bulb-outs"*Installation of AC pavement over milled and fully removed pavement areas within the street to the finished grade*Adjustment of any utility valves/lids to finished grade of construction Traffic signal, fiber-optic communication and electrical service modifications:*Installation of traffic signal poles, traffic signal controllers and cabinets, vehicle heads, pull boxes, bicycle video detection camera systems, bicycle push buttons, traffic signal and electrical conduits, cables, and wiring, and modification of existing in-pavement vehicle and bicycle detection loops*Installation of single-mode fiber-optic cable traffic signal interconnect, pull boxes, fiber splicing and HDPE conduits*Removal and replacement of existing electrical service cabinets*Installation of overhead service conductors and drop cables, electrical pull boxes, and cable riser on an existing utility pole*Temporary Work Zone Traffic control in accordance with the Construction Plans and Special Provisions. Karen Little - 818-238-5466 BurbankPurchasing@burbankca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT