Access the Full Project by Clicking here!
Bidjugde
JOB
Earthquake Safety Program Aerial Structures A Line Lake Merritt
BID DATE
07/28/15 - 2:00
AGENCY
BART
ESTIMATE
$13,400,000
SCOPE
The work in this Contract includes but is not limited to structural retrofit of pier foundations, bent caps and infill-walls; demolition of selected existing facilities; shoring for excavation support; falsework, excavation and backfill; clearing and grubbing; drilling and bonding dowels in concrete; drilling and bonding dowels with chemical adhesive; providing concrete reinforcing, cast-in-place concrete, prestressed concrete; installation of elastomeric bumper assemblies between existing pier caps and existing girders; temporary and permanent street lighting and traffic control signals and red light enforcement cameras, temporary traffic handling; construction of drainage facilities and sanitary sewers; protection of utilities, protection of railroad facilities and existing infrastructure and restoration of paving, sidewalks and surface features, including landscaping as described in the Contract Documents.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT