Access the Full Project by Clicking here!
Bidjugde
JOB
Slauson & Boyle Street & Traffic Improvements
BID DATE
06/10/15 - 2:00
AGENCY
Vernon
ESTIMATE
$1,900,000
SCOPE
This project consists of removal of 4 to 6 inches deep of the existing asphalt pavement, and rejuvenation by mixing the removed asphalt with new emulsified recycling agents, water and additives by the Cold Central Plant Recycling (CCPR) process. After curing of the recycled asphalt, an overlay of 2-inch thick latex modified asphalt concrete will be installed on the streets per plans. In addition, removal and replacement of damaged curb, gutter, sidewalk, driveways, and the installation of handicap access ramps will be completed per the plans. HighEarly (10 thick) concrete will be constructed at various intersections. Traffic Signal modifications will be made at three intersections. Crack Sealing will be done on Vernon Avenue, 49th Street, 38th Street and Malburg Way. Channelization of paved streets shall include traffic striping and pavement markings. Petromat fabric exists approximately 2 to 4 inches below the existing surface on Boyle Avenue and on Slauson Avenue. Vince Rodriguez Phone: (323) 583-8811 ext. 220 Facsimile: (323) 826-1435 Email: vrodriguez@ci.vernon.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT