Butterfield Ranch Road Pavement Rehabilitation
BID DATE
04/10/25 - 2:00
AGENCY
Chino Hills
ESTIMATE
$1,700,000
SCOPE
The Work comprises, but is not limited to: Mobilization, traffic control, installation of video detection; remove existing traffic signal backplate and replace with retroreflective backplate, removal and reconstruction of deteriorated pavement, grind and overlay asphalt pavement; deep patch removal and replacement of existing asphalt pavement; adjustment to grade of existing water valve covers, sewer, storm drain, and utility manhole covers; remove and reconstruct existing driveway approach, restoration of striping, pavement markings, and legends; installation of thermoplastic crosswalks and signage. https://www.chinohills.org/bids.aspx?bidID=500&admin=1 engineering@chinohills.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT