Access the Full Project by Clicking here!
Bidjugde
JOB
Final Kilometer Sewer Trunk Line Replacement
BID DATE
03/21/25 - 2:00
AGENCY
Los Banos
ESTIMATE
n/a
SCOPE
The major work consists of Furnish and Install approximately 3,328 lineal feet of 36-inch HDPE SDR 21 (Class 100 psi) (STA 10+00 to STA 42+58 & STA 50+98.26 to STA 51+67.52), Furnish and Install 60-inch manholes along the 36-inch sewer pipeline alignment, Construct San Luis Drain Crossing (STA 42+58 to STA 50+98.26), Construct a sewer junction box, tie-in to existing facilities at different locations, Furnish, Install, and Operate Sewer Bypass, Furnish and Install Traffic Control & Detour Plan, Install Owner furnished 368 lineal feet of 48-inch RGRCP C361 C-25, construct the San Luis Canal siphon, construct the San Luis Canal turnout, and construct the San Luis Canal outlet. https://losbanos.org/news/advertisement-for-bids-construction-of-final-kilometer-sewer-trunk-line-replacement/
PREBID
3/13/2025 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT