Access the Full Project by Clicking here!
Bidjugde
JOB
Nhcrwa 31f Proposed 48 Inch 24 Inch 12 Inch Water Line From Huffmeister Road Grant Road
BID DATE
06/24/25 - 11:00
AGENCY
North Harris County Regional Water Authority
ESTIMATE
$33,000,000
SCOPE
Scope of Work for the NHCRWA Project 31F consists of the installation of 48-inch water line, 24-inch and 12-inch water line through a combination of open cut, tunneling construction methods, and Horizontal Directional Drill (HDD) methods, including valves, connections, and appurtenances. The project is constructed from Huffmeister Road to Grant Road through both residential and Harris County Flood Control District areas. The work also includes construction of flow control stations, meters stations, surface water fill lines and connections, in addition to chloramine conversion at Grant Road PUD Water Plant No. 2. Additionally, the project includes chemical and electrical improvements at Grant Road PUD Water Plant No. 1 and Water Plant No. 2. https://www.civcastusa.com/project/67c9bbb2f4435e0c9e02cd04/summary NHCRWAprogram@carollo.com
UPDATES