Access the Full Project by Clicking here!
Bidjugde
JOB
Trophy Club Municipal Utility Disctrict No 1 Fy 2025 Water Line Replacement
BID DATE
04/1/25 - 10:00
AGENCY
Trophy Club Municipal Utility District
ESTIMATE
$2,925,000
SCOPE
This project includes construction of approximately: - 2,220 LF – 12” C900 PVC Water Line (Open Cut) -430 LF – 12” C900 PVC Water Line (By Other Than Open Cut) -570 LF – 12” HDPE Water Line (Pre-chlorinated Pipe Bursting) - 2,740 LF – 8” C900 PVC Water Line (Open Cut) -840 LF – 8” C900 PVC Water Line (By Other Than Open Cut) -450 LF – 6” C900 PVC Water Line (Open Cut) -100 LF – 6” C900 PVC Water Line (By Other Than Open Cut) - 1,270 LF – 2” Polyethylene SDR-9 Water Line (By Other Than Open Cut) - 120 LF – 24” I.D. x 3/8” Thick Steel Casing (Open Cut) - 28 – 12” Gate Valve - 18 – 8” Gate Valves - 13 – 6” Gate Valves -1 – 3” Gate Valve - 4 – 2” Gate Valves -12 – Fire Hydrants - 140 - Services https://www.civcastusa.com/project/67b885f1d5e16ff0fd23808d/summary lhodge@halff.com
PREBID
3/11/2025 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT