projects bidding

Access the Full Project by Clicking here!
Bidjugde
JOB
Tiffany Loop Drainage
BID DATE
07/15/11 - 3:00 REAL-TIME
AGENCY
Town of Marana
ESTIMATE
n/a
SCOPE
The work consists of constructing a storm drainage system, installing future waterline sleeves, a Cortaro Marana Irrigation District (CMID) irrigation line, constructing three (3) driveways to existing businesses and assisting with the corresponding utility adjustments required. Corresponding pavement cut and replacement for storm drainage placement will also be required on the existing Tiffany Loop roadway. Other related incidental work will also be required as specified in the Special Provisions and within the project plans.

PRE-BID
1309971600 REC
TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT