Recycled Water Hydrant System
BID DATE
06/24/15 - 2:00
AGENCY
Windsor
ESTIMATE
$60,000
SCOPE
The work on the Recycled Water Hydrant System involves construction of a ductile iron pipe hydrant, trenching and installation of approximately 90 feet of 6-inch ductile iron pipe, hot tap connection to an existing 20-inch diameter recycled water main, drainage control and spill containment, asphalt concrete surfacing, protective bollards, and sheeting and shoring. All of the materials needed for completion of the proposed work are to be supplied by the Contractor. The estimated construction cost for the project is $60,000.