Phoenix Deer Valley North Ramp Reconstruction
BID DATE
06/30/15 - 2:00 LIVE!
AGENCY
Phoenix
ESTIMATE
$6,400,000
SCOPE
This work shall include reconstruction of the pavement on the Deer Valley Airport north ramp due to significant cracking and deterioration of the existing asphalt pavement structural section. The scope of this project consists of the removal and reconstruction of the existing pavement on the 52 acre ramp along with the replacement or adjustment of various utilities, valve boxes and manholes and the reconstruction of catch basin aprons. The project also includes drainage, grading, paint and striping. There is also a modification to the geometry of the ramp at the run-up area located at the south east end of the ramp. This area will be shifted south of its current location to address safety concerns expressed by the Airport. The project will include sustainability initiatives, thus the Contractor shall comply with the City of Phoenix Aviation Departments Design and Construction Green Guide Sustainable Horizontal Design and Construction Green Guide

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT