Access the Full Project by Clicking here!
Bidjugde
JOB
South Berkeley Bikeway Bus Stops Improvements
BID DATE
04/3/25 - 2:00
AGENCY
Berkeley
ESTIMATE
$4,227,000
SCOPE
More specifically, the Work consists of but is not limited to, coordination with utility companies, AC Transit, BART, and nearby businesses and residents; saw-cutting; removal of existing pavement markings and raised pavement markers; removal of existing asphalt concrete pavements; removal of Portland cement concrete curbs, gutters, and sidewalks; construction of new Portland cement concrete sidewalks, curb ramps, medians, and bus stop pads; installation of asphalt concrete pavement and speed tables; installation of new bus stop shelters and benches; adjusting utility boxes and covers to grade; installation of pavement striping and markings; installation of curb paint; installation of signage; installation of traffic circle; installation of pedestrian hybrid beacons (PHBs); and installation of solar-powered Rectangular Rapid Flashing Beacons (RRFBs) and lighting. https://berkeleyca.gov/doing-business/working-city/bid-proposal-opportunities/south-berkeley-bikeway-and-bus-stops jpeoples@berkeleyca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT