Access the Full Project by Clicking here!
Bidjugde
JOB
2014 Water Systems Improvement
BID DATE
06/17/15 - 2:00
AGENCY
Pittsburg
ESTIMATE
$2,000,000
SCOPE
The work of this Contract consists in general of the installation of 8", and 6" PVC water mains, 16" Ductile Iron water mains, fittings and valves to replace the existing water distribution and transmission systems at three locations in the City of Pittsburg and one street adjacent to the City Limit. The scope of work includes but is not necessarily limitedto; furnishing all products and materials including pipe, fittings , valves, and all incidentals to the pipe installation, backfill materials and surfacing materials; construction layout; verification of the exact location and depth of existing subsurface facilities; excavation and installation of water pipe and appurtenances; installation of water services, abandonment of existing water system, placement and compaction backfill materials; trench resurfacing; and the furnishing of all other products, materials, and construction of all other improvement work as shown on the plans and or described in the specifications.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT