projects bidding

Access the Full Project by Clicking here!
Bidjugde
JOB
Gila Bend-Casa Grande Hwy (STP-084-A(201)A)
BID DATE
07/22/11 - 11:00 LIVE! REAL-TIME
AGENCY
ADOT
ESTIMATE
$3,500,000
SCOPE
The amount programmed for this contract is $3,500,000. The location and description of the proposed work and the representative items and approximate quantities are as follows: The proposed pavement preservation project is located in Pinal County on SR 84 beginning approximately 0.5 miles east of the Town of Stanfield, at milepost 166.33 and extending eastward to milepost 172.55, about half a mile east of Montgomery Road. The proposed work consists of milling of asphaltic concrete, replacing and overlaying it with Asphaltic Concrete (End Product) (3/4” Mix) and Polymer Chip Seal, placing Warm Mix Asphalt (WMA) in three test sections, paving turnouts, placing shoulder build-up, applying pavement markings, installing signs and performing other related work. REPRESENTATIVE ITEMS UNIT QUANTITY Remove Bituminous Pavement (Milling)(2 ¾”) SQ.YD. 101,831 Shoulder Build-UP (Milled AC) L.FT. 65,240 Emulsified Asphalt (CRS-2P) TON 287 Asphalt Binder (PG 70-10) TON 1,464 Asphaltic Concrete (3/4” Mix)(End Product) TON 27,614 Pavement Marking (Extruded Thermoplastic)(0.090”) L.FT. 115,260 Loop Detector Traffic Counter System EACH 1 Seeding (Class II) ACRE 8 Erosion Control (Wattles)(9”) L.FT. 979 Construction Surveying and Layout L.SUM 1 Ground-In Rumble Strip (8 Inch) L.FT. 48,500

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT