Rehabilitate Runway 13-31 2nd Phase
BID DATE
06/16/15 - 3:00
AGENCY
Hollister
ESTIMATE
$6,200,000
SCOPE
Base Bid – the full depth reconstruction of a portion of Runway 13-31 and includes: the modifications to the existing paved and unpaved runway shoulders and the associated infield grading; the installation of new electrical duct banks; the adjustment of existing electrical facilities including edge lights, directional signs and conduit; and the reinstatement of the runway pavement markings. Additive Alternative No. 1 comprises of the full depth crack repair for various lengths in Taxiway ‘A’. Additive Alternative No. 2 comprises of the mill and overlay pavement rehabilitation of the taxiway preceding Runway 13-31. Kevin Flynn City of Hollister 765 The City Drive Suite 400 Orange, CA 95868 Tel:(714) 705-1333 Fax:(714) 938-9488 kevin.flynn@kimley-horn.com
PREBID
6/4/2015 1:00