Access the Full Project by Clicking here!
Bidjugde
JOB
Hahn Water Production Facility
BID DATE
06/23/15 - 3:00
AGENCY
Chandler
ESTIMATE
n/a
SCOPE
addendum changed bid date: DUE 6/18, OPEN 6/19. Work under this contract includes: performing a condition assessment and design improvements for the refurbishment and commissioning of an existing water storage and booster pumping facility. The Hahn Water Production Facility consists of a 2 million gallon steel reservoir and an associated 7.6 million gallons per day capacity pumping station. At this time, a number of improvements are needed to upgrade the facility in order to accommodate the anticipated future operational needs within its service area. The steel storage reservoir needs to be reconditioned. The pumping equipment needs to be replaced with variable speed driven motors to be compatible with the current hydraulic system operation. The completed facility will play an important future role in maintaining water supply and pressure levels in the surrounding service area particularly during the peak demand seasons.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT