Access the Full Project by Clicking here!
Bidjugde
JOB
Rollingwood Blvd Sewer Relief
BID DATE
06/25/15 - 2:00
AGENCY
Sacramento County
ESTIMATE
$2,300,000
SCOPE
The work to be performed under this contract includes the furnishing of all labor, materials, tools and equipment for the Rollingwood Boulevard (NEA-5) Sewer Relief Project. The work includes removal and replacement of approximately 1,077 linear feet of 6-inch diameter with 15-inch diameter vitrified clay pipe (VCP) along Butternut Drive from Treeleaf Way to just south of Oakmyrtle Way; construction of approximately 485 linear feet of 15-inch diameter VCP installed inside a steel casing underneath Interstate 80; and removal and replacement of 1,694 linear feet of 12-inch diameter with 15-inch diameter VCP along Rollingwood Boulevard, from Sweetwood Court to Antelope Road. A majority of the pipeline construction will be by open cut method, with the exception of a trenchless highway crossing installed by a tunnel boring machine or guided boring. All work associated with this contract shall include, but not limited to mobilization/demobilization, dewatering of excavation, sheeting, shoring and bracing of excavation, construction of launching/receiving shafts, traffic control, erosion and sediment control, cleaning, debris removal and disposal, verification of pipe lengths and diameters, sewer flow control, furnishing and installing pipe, inspection and testing, permitting, fencing, site restoration
PREBID
5/27/2015 9:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT