Access the Full Project by Clicking here!
Bidjugde
JOB
Alley Water Service Conversion Golden Avenue and Maine Avenue
BID DATE
06/17/15 - 10:00
AGENCY
Long Beach
ESTIMATE
$722,450
SCOPE
The Work involves furnishing all labor, materials, and equipment necessary to install new Ductile Iron Pipelines, copper water services, fire hydrant assemblies, Gate Valves and reconnection of the private property house service laterals from the parkway meter location to the house service point of connection. The Bid will be for Work as detailed on the Drawings and Specifications. The house service reconnections work consists of all labor, materials and equipment necessary to construct and connect copper water service lines from the installed ductile iron pipelines and water meters to customer connections as shown on the Drawings and in accordance with the Project Specifications. This includes installation of pipe, valves, fittings, and connections as shown on the Drawings, including surface restoration, chlorination and testing necessary to place in service the pipelines and associated appurtances. Ms. Wendy Chen - 562-570-2324 Wendy.Chen@lbwater.org
PREBID
5/28/2015 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT